The solution
The client Water Authority Noorderzijlvest selected Nereda as the best wastewater purification solution to run alongside the existing plant and treat almost half of the wastewater flow. Nereda’s technology represents a revolution in sustainable wastewater treatment and relies purely on biological action to purify effluent, before returning clean water to the environment. Aerobic, anoxic and anaerobic biological treatments take place in each Nereda reactor. Two 9,500m³ Nereda tanks were constructed to treat approximately 40% of the sewage coming to Garmerwolde, with effluent design targets for TN and TP of 7 and 1 mg/l respectively. These tanks were designed with a total capacity of 140,000 p.e. (30,000 m³ per day on average and 4,200 m³ per hour peak flow) and operate in parallel to the existing treatment works.